Gestra TA7

Gestra TA7. Gestra, TA7, Gestra TA7
يمكنك الحصول على عرض الآن: info@industrialmaterialcenter.com
رقم المنتج TA7
المصنع Gestra

Description: TA7 ( Gestra )

Gestra TA7



Product Name: Gestra TA7
Product Brand: Gestra
Product Code: TA7
Product Artikel: Gestra TA7
Description Electronic unit for the generation of periodic pulses to initiate a blowdown cycle via the GESTRA rapid-action intermittent blowdown valve type MPA 46 or 47, i.e. automation of intermittent boiler blowdown. Equipment for steam boilers to TRD 401, section 6.4. The programme-controlled blowdown system consists of an electronic cycling timer, a three-way solenoid valve and a strainer. The equipment meets the German regulations for use in steam-boiler plants operating without constant supervision or with limited supervision (TRD 602 and TRD 604, sheet 1). Function The cycling timer type PRS 8 generates a control pulse which, after the preset blowdown interval, operates the three-way solenoid valve. This in turn actuates the rapid-action blowdown valve by means of compressed air or pressurized water and closes it again at the end of the pulse (blowdown) duration. The blowdown interval and the pulse duration can be coarsely preset with a code switch. Final adjustment is carried out with the aid of two potentiometers. For test purposes and in the event of power failure the three-way solenoid valve can be operated by hand. A push-button manual override is provided on the solenoid valve which allows a test of the blowdown valve as required by certain regulations in force.

Gestra VDM

Gestra DRT

Gestra PA46

Gestra PA47

Gestra NDR-SW

Gestra TA7

Gestra URB2

Gestra SBO31

Gestra SZ36A

غيرها من المنتجات الموصى بها Gestra