Gestra TA7
Gestra
제품 번호: TA7
프로듀서: Gestra
Confirmed Rating:
☆☆☆☆☆☆
(4.5)
Rating Count: 10618
온라인 견적 양식을 작성하거나 라이브 지원팀에 연락하여 다음과 같이 문의할 수 있습니다. Gestra 브랜드, TA7 제품입니다. 최대한 빠른 시일 내에 연락드리겠습니다.
PLEASE MAIL TO: info@industrialmaterialcenter.com
Datasheets for Gestra TA7
Description for Gestra TA7
Description Electronic unit for the generation of periodic pulses to initiate a blowdown cycle via the GESTRA rapid-action intermittent blowdown valve type MPA 46 or 47, i.e. automation of intermittent boiler blowdown. Equipment for steam boilers to TRD 401, section 6.4. The programme-controlled blowdown system consists of an electronic cycling timer, a three-way solenoid valve and a strainer. The equipment meets the German regulations for use in steam-boiler plants operating without constant supervision or with limited supervision (TRD 602 and TRD 604, sheet 1).Function The cycling timer type PRS 8 generates a control pulse which, after the preset blowdown interval, operates the three-way solenoid valve. This in turn actuates the rapid-action blowdown valve by means of compressed air or pressurized water and closes it again at the end of the pulse (blowdown) duration. The blowdown interval and the pulse duration can be coarsely preset with a code switch. Final adjustment is carried out with the aid of two potentiometers. For test purposes and in the event of power failure the three-way solenoid valve can be operated by hand. A push-button manual override is provided on the solenoid valve which allows a test of the blowdown valve as required by certain regulations in force.
Latest Comments for Gestra TA7
기타 추천 제품 Gestra