Gestra TA7
Gestra
Ürün No: TA7
Üretici: Gestra
Confirmed Rating:
☆☆☆☆☆☆
(4.5)
Rating Count: 10618
Gestra markalı, TA7 koduna sahip Gestra TA7 isimli ürün hakkında detaylı bilgi almak için lütfen canlı destek ekibimiz ile hemen iletişime geçin ya da bir online teklif formu doldurun. Size en kısa sürede dönüş yapacağız.
PLEASE MAIL TO: info@industrialmaterialcenter.com
Datasheets for Gestra TA7
Description for Gestra TA7
Description Electronic unit for the generation of periodic pulses to initiate a blowdown cycle via the GESTRA rapid-action intermittent blowdown valve type MPA 46 or 47, i.e. automation of intermittent boiler blowdown. Equipment for steam boilers to TRD 401, section 6.4. The programme-controlled blowdown system consists of an electronic cycling timer, a three-way solenoid valve and a strainer. The equipment meets the German regulations for use in steam-boiler plants operating without constant supervision or with limited supervision (TRD 602 and TRD 604, sheet 1).Function The cycling timer type PRS 8 generates a control pulse which, after the preset blowdown interval, operates the three-way solenoid valve. This in turn actuates the rapid-action blowdown valve by means of compressed air or pressurized water and closes it again at the end of the pulse (blowdown) duration. The blowdown interval and the pulse duration can be coarsely preset with a code switch. Final adjustment is carried out with the aid of two potentiometers. For test purposes and in the event of power failure the three-way solenoid valve can be operated by hand. A push-button manual override is provided on the solenoid valve which allows a test of the blowdown valve as required by certain regulations in force.
Latest Comments for Gestra TA7
İlginizi Çekebilecek Ürünler Gestra